Rambla Pacifico Road Reconstruction
4 Documents in Project
Summary
SCH Number
2010031128
Lead Agency
City of Malibu
Document Title
Rambla Pacifico Road Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2010
Document Description
Environmental Impact Report No. 08-002, Coastal Development Permit No. 07-098, Variance Nos. 08-004, 08-005, 08-006, and 08-007, and Site Plan Review No. 10-010- The proposed project is to construct a 20 foot wide, 1,800 linear feet long, private access road to re-establish a linkage between the northern and southern sections of Rambla Pacifico Street, previously destroyed by a landslide; including four variances for the construction of retaining walls on slopes in excess of 2 1/2 to 1, for grading in excess of 1,000 cubic yards per residential parcel, for the reduction of the 100 foot stream environmentally sensitive habitat area setback and from the required 1.5 geologic factor of safety, and a site plan review for approximately 6,400 cubic yards of remedial grading, as recommended by the project consulting geologist, and an offer to dedicate a public trail easement.
Contact Information
Name
Stephanie Danner
Agency Name
City of Malibu
Contact Types
Lead/Public Agency
Phone
Location
Cities
Malibu
Counties
Los Angeles
Cross Streets
PCH and Rambla Pacifico Street
Zip
90265
State Highways
Hwy 1
Schools
Carden Malibu
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.