Quail Valley Sewer Improvements Subarea 9 - Phase 1

10 Documents in Project

Summary

SCH Number
2010031113
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Quail Valley Sewer Improvements Subarea 9 - Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
10/27/2015
Present Land Use
Not Applicable as Project will be within Public Street Rights-of-Way
Document Description
The Quail Valley Sewer Improvements Subarea 9 - Phase 1 Project will provide gravity sewer services to 149 existing homes and 66 vacant lots along Vista Way, Casa Bonita Avenue, Datil Drive, and Platino Drive, located within the Subarea 9 - Phase 1 project boundary. Approximately 1.6 miles of 8-inch diameter collection pipelines will be installed within the public right of way. Sewer laterals will also be installed that extend onto private property to connect to sewer sources and eliminate the need for septic tanks. The project also proposes to construct a new regional lift station near the intersection at Audie Murphy Ranch Road and Normandy Road. Additionally, the proposed project would construct a new transport line to convey wastewater from the Subarea 9 - Phase 1 project area, to the new regional lift station. Two alternative alignments have been considered for the transport line.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Menifee
Counties
Riverside
Cross Streets
Goetz Rd and Vista Wy
Zip
92587
State Highways
Hwy 15 and 215
Schools
Quail Valley ES
Waterways
Canyon Lake, Salt Creek, San Jacinto River
Township
5S
Range
4W
Section
36
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.