Lift Station #2 Replacement Project

2 Documents in Project

Summary

SCH Number
2010031107
Lead Agency
Rainbow Municipal Water District
Document Title
Lift Station #2 Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project proposes improvements to the existing Rainbow Municipal Water District Lift Station #2. Improvements would provide for a submersible pump station with adequate capacity to convey wet weather flow. The proposed pump station would have a minimum of five minutes of pump(s) run time wet well capacity (14,000 gallons); an emergency storage tank; a back-up generator to power all operational pump(s); odor control system9s); and state-of-the-art monitoring and SCADA.

Contact Information
Brian Lee
Rainbow Municipal Water District
3707 South Highway 395
Fallbrook, CA 92028

760-728-1178 x 145

Location

Coordinates
33°16'2.17"N 117°13'59.73"W
Counties
San Diego
Cross Streets
Old River Rd/Little Gopher Canyon Rd
Zip
92028
Total Acres
0.22
Parcel #
portions of 126-170-13, 40
State Highways
SR 76, S 13
Schools
Bonsall ES
Waterways
San Luis River, Little Gopher Canyon Creek
Township
10S
Range
3W
Section
31
Base
SBB&M
Other Location Info
City/Nearest Community: Bonsall

Notice of Determination

Approving Agency
Rainbow Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Rainbow Municipal Water District 3707 Old Highway 395 Fallbrook, CA 92028

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search