River Road Multi Use Trail Project; Agreement 1600-2010-0070-R4

3 Documents in Project

Summary

SCH Number
2010031079
Lead Agency
Paso Robles, City of (City of Paso Robles)
Document Title
River Road Multi Use Trail Project; Agreement 1600-2010-0070-R4
Document Type
NOD - Notice of Determination
Received

Document Description
The applicant proposes to create a Class One multipurpose trail, approximately 425 ft in length, along the Salinas River channel. The trail would be 12 ft wide, including an 8 ft wide concrete main path and 2 ft wide shoulders, and located along the outer right-side edge (looking downstream) of the channel, immediately below South River Road. Portions of the bank would be excavated to install short retaining walls at some locations along the trail. Riparian vegetation such as willows, poison oak, coyote brush, and other vegetation would be trimmed and one mature willow tree would be removed to accommodate the trail. Equipment used will include backhoes, graders, concrete trucks, and similar equipment.

Contact Information
Mike Hill
Department of Fish and Game
Central Region 1234 East Shaw Avenue
Fresno, CA 93710

805-594-6141

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
13th St/Navaho Rd
Zip
93446
Parcel #
multiple
State Highways
Hwy 101, SR 46 East
Railways
UPRR
Airports
Paso Robles Municipal
Schools
Paso Robles SD
Waterways
Salinas River
Township
26S
Range
13E
Section
7
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
City of Paso Robles 1000 Spring St Paso Robles, CA 93446

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes