133 Pacific Ave-Fletcher Cove Community Center Disabled Access Improvements and Refurbishment Plan
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010031049
- Lead Agency
- Solana Beach, City of (City of Solana Beach)
- Document Title
- 133 Pacific Ave-Fletcher Cove Community Center Disabled Access Improvements and Refurbishment Plan
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/22/2010
- Document Description
- The City of Solano Beach is proposing renovation to the Fletcher Cove Community Center and site. The proposed project includes improvements which are necessary to comply with the Americans with Disabilities Act (ADA) and to extend the durable life of the building by making the necessary health, safety and building upgrades. Proposed improvements include refurbishment of the existing community center building, construction of ADA parking and access, landscaping improvements, and patios, benches, and pathways.
- Contact Information
-
Tina Christiansen
City of Solana Beach
635 South Highway 101
Solano Beach, CA 92075
Phone : (858) 720-2444
Location
- Coordinates
- 32°52'30.7"N 117°16'24.5"W
- Cities
- Solana Beach
- Counties
- San Diego
- Cross Streets
- Acacia and Pacific Ave
- Zip
- 92075
- Total Acres
- 0.95
- Parcel #
- 298-101-65
- State Highways
- Hwy 101, I-5
- Railways
- NCTD
- Waterways
- Pacific Ocean, San Elijo, San Dieguito River
- Township
- 13S
- Range
- 4W
- Section
- 34
- Base
- SBB&M
Notice of Determination
- Approving Agency
- City of Solana Beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Solana Beach 635 South Highway 101 Solana Beach, CA 92075
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.