Orange County Parks Aliso and Wood Canyons Wilderness Park Repair Project

2 Documents in Project

Summary

SCH Number
2010031041
Lead Agency
Orange County
Document Title
Orange County Parks Aliso and Wood Canyons Wilderness Park Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2011
Present Land Use
Open Space/Open Space Reserve/Open Space
Document Description
The project proposes to repair 4 separate areas of the existing trail network within the Aliso and Wood Canyons Wilderness Park, which were made impassable to emergency vehicles as a result of a 2004/2005winter storm event. Proposed repairs include removal and replacement of corrugated steel pipes to convey future storm flows beneath the Wood Canyon Trail; erosion repair along the Wood Canyon Trail, including the removal of a fallen tree and rock riprap and replacement with compacted fill and placement of rock rip-rap; relocation of section of the Mathis Service Road/Trail; repair to the creek bank through cut and fill and placement of rock rip-rap; and repair and stabilization of the Valido Trail and adjacent creek bank through installation of a mechanically stabilize earth wall.

Contact Information

Name
Darren Bradford
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Laguna Beach
Counties
Orange
Cross Streets
SR 73/SR 133
Total Acres
~12
State Highways
SR 73, SR 133
Other Location Info
Nearest Community: Aliso Viejo

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print