Panoche Valley Solar Farm (Amendment No. 1 to Streambed Alteration Agreement No. 1600-2014-0042-R4)
17 Documents in Project
Summary
SCH Number
2010031008
Lead Agency
San Benito County
Document Title
Panoche Valley Solar Farm (Amendment No. 1 to Streambed Alteration Agreement No. 1600-2014-0042-R4)
Document Type
NOD - Notice of Determination
Received
Posted
9/17/2018
Present Land Use
Agricultural Rangeland
Document Description
CDFW has executed Amendment 1 to Streambed Alteration Amendment Agreement No. 1600-2014-0042-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Panoche Valley Solar, LLC.
The project includes stream alterations at 4 locations within the Panoche Valley Solar Farm project to construct one road crossing, fences, a stormwater detention basin, and photovoltaic (PV) solar panel arrays; flattening of stream channels to bring topography within the tolerance required for PV array installation. Tires, scrap metal, farm equipment, and other dumped material will be removed from streams at nine locations on habitat compensation lands and hauled to a landfill. California tiger salamander breeding pond construction projects will occur at two additional locations. Amendment No. 1 reduced the number of stream alterations within the Solar Farm from 29 to 4.
Contact Information
Name
David Hacker
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Benito
Cross Streets
Panoche Road and Little Panoche Road
Zip
95043
Total Acres
2506
Parcel #
Multiple
State Highways
No
Railways
No
Airports
No
Schools
Panoche
Waterways
Panoche Creek, Las Aguilas Creek
Other Location Info
City/Nearest Community: Panoche
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes