Well No. 2 Replacement - Arsenic Removal Project

Summary

SCH Number
2010028023
Lead Agency
Armona Community Services District
Document Title
Well No. 2 Replacement - Arsenic Removal Project
Document Type
NOE - Notice of Exemption
Received

Document Description
The project will consist of a feasibility study to determine facility improvements needed to achieve compliance with the arsenic MCL for the District's Well No.2 and Well No. 1. The study will include drilling a test well (to a depth of 1,800 feet below site grade) and conducting zone testing to obtain data needed to design a production well and determine water quality characteristics. The test well will be abandoned in compliance with state and local requirements after testing is completed. Test well findings will be used to determine if treatment facilities will be required to remove arsenic (or other constituents).

Contact Information
Matthew Kemp
Armona Community Services District
10956 14th Avenue PO BOX 486
Armona, CA 93202

559 449-2700

Location

Counties
Kings
Other Location Info
Armona

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15300 - Class 6
Reasons for Exemption
The project will provide data to assist in designs and evaluation of alterantives by drilling a test wll. The drilling of a test well is a minor, temporary disturbance to the environment.
Download CSV New Search