Marysville Ring Levee Improvement Project - Phase 2A South and 2C

25 Documents in Project

Summary

SCH Number
2010024001
Lead Agency
Central Valley Flood Protection Board
Document Title
Marysville Ring Levee Improvement Project - Phase 2A South and 2C
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2018
Document Description
Phase 2A South and 2C occur along existing levees located south of 5th St. Bridge & west of J St., 3rd St., and F St. Phase 2A South: A soil cement bentonite (SCB) wall will be constructed on the waterside toe of the levee using the Deep Mix Method. Impervious fill will replace the exterior portion of the excavated material (approx. 27,400 sq. yds.) There will be up to 1.3 acres of in-kind material placed on the slope north and south of the 5th St. Bridge. Phase 2C: A SCB wall using the method describe in Phase 2A South, will be constructed through the center of the levee. There will be up to 2 acres of in-kind material placed on the slope south-west of the 5th St. Bridge.

Contact Information

Name
David Moldoff
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Yuba
Cross Streets
14th St and 5th St
Zip
95901
Total Acres
35
Parcel #
mult
State Highways
70
Waterways
Yuba River, Feather River

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print