Permit 17806-1: Yuba River Basin, California Project - Marysville Ring Levee Project Phases 2B and 3 Utility Relocation: Replacement of Utilities

25 Documents in Project

Summary

SCH Number
2010024001
Lead Agency
Central Valley Flood Protection Board
Document Title
Permit 17806-1: Yuba River Basin, California Project - Marysville Ring Levee Project Phases 2B and 3 Utility Relocation: Replacement of Utilities
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2022
Document Description
Approval of Permit No. 17806-1, under the California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To relocate the Smartville-Marysville 60 kV and Pease-Marysville-Harter 60kV electric transmission lines with overhead distribution lines along the waterside embankment of the right (north) bank of the Yuba River as part of Phase 2B of the USACE Marysville Ring Levee Project. Work includes installing twelve distribution poles (eight permanent poles and four temporary poles), removing seven distribution poles, replacing five distribution poles, and permitting four existing transmission poles along with overhead electrical facilities (17 poles to remain).

Contact Information

Name
Kalia Schuster of the Department of Water Resources
Agency Name
Central Valley Flood Protection Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Yuba
Regions
Northern California
Other Location Info
The project is located in Marysville, east of Highway 70, along the right (north) bank of the Yuba River at landside and waterside points in the proximity of the terminus of 4th Street at the levee in Yuba County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.