Permit 19631: Yuba River Basin - Marysville Ring Levee Project Phases 2B & 3: T-Mobile/Sprint Utility Reloc. at Sta 320+00
25 Documents in Project
Summary
SCH Number
2010024001
Lead Agency
Central Valley Flood Protection Board
Document Title
Permit 19631: Yuba River Basin - Marysville Ring Levee Project Phases 2B & 3: T-Mobile/Sprint Utility Reloc. at Sta 320+00
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2022
Document Description
Approval of Permit No. 19631, under the California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To place existing aerial cable from Station 301+40 to Station 320+00 in a new underground two-inch pipe as part of the Marysville Ring Levee federal project.
Contact Information
Name
Kalia Schuster at Department of Water Resources
Agency Name
Central Valley Flood Protection Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency
Phone
Location
Cities
Marysville
Counties
Yuba
Regions
Northern California
Other Location Info
The project is located in the floodway near Ramirez Street opposite 8th Street and along the landside toe from Blue Street to Buchanan Street., within Section 24, T15N, R3E, MDB&M, in Yuba County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
Yuba
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.