2010 Proposition 1-B Street Rehabilitation Project
2 Documents in Project
Summary
SCH Number
2010022031
Lead Agency
City of Dorris
Document Title
2010 Proposition 1-B Street Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2010
Document Description
The proposed project includes rehabilitation of existing streets within the City of Dorris, CA. Each of the roadways shall be excavated to grades which allow for storm runoff will flow across the surface to the East. The majority of the storm runoff will flow into roadside retention basins on the East side of South Railroad Avenue. The northerly portion of South Railroad Avenue from Second Street to the State Route 97 shall be directed to a new storm drain pipe. The new storm drain conduit shall be buried four to five feet in depth and run westerly across Railroad Avenue and West along State Route 97 to an existing drainage inlet located at the East side of South Pine Street. The existing storm pipe runs westerly along State Route 97 and then northerly of the State Highway to an existing retention basin City Property. Existing onsite materials shall be excavated to subgrade elevations and be exported to an approved disposal site. Class 2 aggregate base shall be placed 8" in depth in areas to be paved followed by a 2.5" lift of asphalt concrete paving. Roadway shoulder materials shall be 6" deep class 2 aggregate base material. Existing roadside drainage ditches shall be modified as necessary to provide for runoff to flow to the East side of South Railroad Avenue.
Contact Information
Name
Carol McKay
Agency Name
City of Dorris
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Dorris
Counties
Siskiyou
Cross Streets
Hwy 97; S. Railroad Ave; S. Pine St, Third St
Zip
96023
Total Acres
2.0
Parcel #
city road ways
State Highways
97
Railways
UPRR
Schools
Butte Valley District
Township
48N
Range
1E
Section
31
Base
MDB&M
Notice of Determination
Approving Agency
Dorris City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.