Northwest Airport Way Master Plan

5 Documents in Project

Summary

SCH Number
2010022024
Lead Agency
City of Manteca
Document Title
Northwest Airport Way Master Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
General Agriculture (General Plan); General Agriculture, 40-acre Minimum (Zoning)
Document Description
There are two projects: 1) Northwest Airport Way Master Plan and 2) non-master plan annexations. The Northwest Airport Way Master Plan would guide the development of industrial uses, community commercial uses, and associated site improvements on 390 acres. The Master Plan area would be annexed into the City of Manteca. The CenterPoint Intermodal Facility, a 4.1 million square foot integrated logistics center, would be the primary land use within the Master Plan area. The non-master plan annexation plan annexations consist of annexing two areas ("East" and "South") adjacent to the Master Plan aea that total 77 and 144 acres, respectively into the City of Manteca.

Contact Information

Name
Rochelle Henson
Agency Name
City of Manteca
Contact Types
Lead/Public Agency

Location

Cities
Manteca
Counties
San Joaquin
Cross Streets
Lathrop Road / Airport Way
Zip
95337
Total Acres
611
Parcel #
198-200-02
State Highways
I-5
Railways
Union Pacific
Schools
Manteca Unified
Waterways
South San Joaquin Irrigation District Canal
Township
1S
Range
6E
Section
Unsec
Base
Diablo

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Public Health (CDPH), California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Industrial (Sq. Ft. 4.1 mil., Acres 390)
Local Actions
General Plan Amendment, Master Plan, Prezone, Annexation
Project Issues
Biological Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print