Anchor Bay Downdrain Reconstruction

3 Documents in Project

Summary

SCH Number
2010022019
Lead Agency
California Department of Transportation, District 3
Document Title
Anchor Bay Downdrain Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2010
Present Land Use
Rural Coastal (C)
Document Description
The California Department of Transportation (Caltrans) proposes to repair a culvert on State Route 1 at Post Mile (PM) 4.47 in the town of Anchor Bay in Mendocino County. The proposed project is to replace the culvert downdrain. No work will be done in the existing crossdrain, except where the new cable-anchor system will be attached to the last joint of the existing culvert; Therefore no concrete pile anchors will be required. Removal of the existing downdrain will involve debris and/or vegetation clearing and grading. The existing downdrain will then be replaced by a new rock-lined ditch and black plastic downdrain. The rock-lined ditch will contain two pools that serve as frog habitat and willows will be planted between the rocks. There will be no excess dirt because the slope of the new downdrain will be determined by re-grading the existing embankment.

Contact Information

Name
Sandra Rosas
Agency Name
California Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Cross Streets
Highway 1 and Ocean View Drive
Zip
95445
Parcel #
1440221300
State Highways
1
Waterways
Pacific Ocean
Other Location Info
City/Nearest Community: Anchor Bay

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print