575 and 591 Embarcadero Mixed Use Hotel and Commercial Project

2 Documents in Project

Summary

SCH Number
2010021029
Lead Agency
City of Morro Bay
Document Title
575 and 591 Embarcadero Mixed Use Hotel and Commercial Project
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2010
Document Description
The proposed project will demolish the existing buildings and replace them with two similar mixed-use structures that will include a total of two commercial suites encompassing 1,280 sf and a 6 room hotel (4,029 sf) with a public lateral access boardwalk. The site is ~8,340 sf. In addition, an existing dock will be removed and a new access ramp and 8 ft wide by 70 ft long floating dock will be constructed. The new floating dock will be stabilized by struts and cross ties attached to land portion of the lease sites in order to avoid adverse biological impacts within the water. A 10 ft wide later access boardwalk will be constructed the lencth of the project. A 27 ft wide view corridor through the project is proposed to connect to the boardwalk. Americans with Disabilities Act compliant public restrooms are also proposed within the 27 ft wide corridor. An existing private patio deck will be reconstructed as a public access view deck providing a connection to the public lateral access boardwalk.

Contact Information

Name
Genene Lehotsky
Agency Name
City of Morro Bay Public Services Department
Contact Types
Lead/Public Agency

Location

Cities
Morro Bay
Counties
San Luis Obispo
Cross Streets
Marina Street
Parcel #
066-137-001
State Highways
Hwy 1
Waterways
Morro Bay, Pacific Ocean

Notice of Determination

Approving Agency
City of Morro Bay
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.