Operation of San Bernardino Valley Mutual Water District (SBVMWD) Baseline Feeder Well Replacement Project

3 Documents in Project

Summary

SCH Number
2010021023
Lead Agency
San Bernardino Valley Municipal Water District
Document Title
Operation of San Bernardino Valley Mutual Water District (SBVMWD) Baseline Feeder Well Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2012

Document Description
Reference SCH#1988121892 The California Department of Public Health (Department), as the responsible agency, will be issuing a water supply permit. The SBVMWD proposed project includes drilling and operating 2 replacement wells each with a capacity of 2,500-3,000 GPM. The project also includes constructing a reservoir of up to 1 MG for volatizing gases such as CO2. Other associate facilities to be constructed include a pump station, a chlorination system, detention pond, control system, buildings for booster pump and control panels, and a limited amount of pipeline.

Contact Information
Sean McCarthy
CA Department of Public Health
San Bernardino District Office 464 W. 4th St Room 437
San Bernardino, CA 92401

Phone : (909) 383-4328

Location

Coordinates
34°06'53"N 117°19'38"W
Cities
San Bernardino
Counties
San Bernardino
Cross Streets
9th Street/ N. California & Baseline Road
Parcel #
0139-341-12 / 0269-181-04
State Highways
10, 210 and 215
Railways
Yes
Schools
Yes
Waterways
Lytle Creek, Cajon Wash
Township
1S, 1N
Range
4W, 4W
Base
SBM
Other Information
Second Location Lat/Long: 34-07-22/ 117-20-61

Notice of Determination

Approving Agency
San Bernardino Valley MWD
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
CA Department of Public Health San Bernardino District Office 464 W. 4th St Room 437, San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print