John Dutra - County File #LP052028

Summary

SCH Number
2010019001
Lead Agency
Contra Costa County
Document Title
John Dutra - County File #LP052028
Document Type
NOD - Notice of Determination
Received

Document Description
The applicant request approval of a land use permit to amend County File #LP952083, a previously approved land use permit for the Lindquist Landing Marina. The current request if to allow the following improvements: (1) one 750 ft long, 6 ft long wide dock with 4 gangways, connected to 38 steel pilings driven in Rock Slough; (2) one 45 ft by 150 ft RV/boat storage buildings; (3) one 60 ft by 220 ft RV/storage building; (4) two 60 ft by 240 ft RV/storage buildings; (5) 22 outdoor RV/boat storage spaces; and (6) ancillary improvements associated with the project including repaving, new paving, and construction of self-retaining areas designed to treat stormwater runoff. Implementation of the project would require minor grading and site preparation work. The project includes a request for approval of variances to allow a front setback of 0 ft for the proposed gangways, where a minimum setback of 25 ft is required and a rear setback of 0 ft for the proposed dock, where a minimum setback of 15 ft id required. The project also includes a request to work within the driplines of several code-protected trees for the purpose of installing the gangways. The site is located at 4888 Holland Tract Road in the Knightsen area. (GP: DR, WA) (A-2) (CT: 3010.00) (Parcel #023-030-005).

Contact Information
William Nelson
Contra Costa County Dept of Conservation and Development
651 Pine Street, 4th Floor North Wing
Martinez, CA 94553-0095

925-335-1208

Location

Counties
Contra Costa

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Contra Costa County Dept of Conservation and Development 651 Pine St, 4th Floor North Wing Martinez, CA 94553-0095

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search