Stream Alteration Agreement No. 2009-0158-R4 Moccasin Reservoir Afterbay Project 2010.
Summary
SCH Number
2010018154
Public Agency
Fish & Game #4
Document Title
Stream Alteration Agreement No. 2009-0158-R4 Moccasin Reservoir Afterbay Project 2010.
Document Type
NOE - Notice of Exemption
Received
Posted
1/13/2010
Document Description
The goal of this Project is to provide operational options to the Moccasin Powerhouse in order to allow generation during exceptionally high water levels in the Moccasin reservoir. This Project would raise the north and south walls of the Powerhouse Tailrace by approximately 3 feet in height using flashboards (such as timber) and the northwest and southeast walls will be raised by 3 feet using concrete. An additional gate would be installed in the tailrace to facilitate tailrace drainage.
Contact Information
Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Tuolumne
Other Location Info
Chinese Camp
Notice of Exemption
Exempt Status
Other
Type, Section or Code
15301
Reasons for Exemption
The Project is minor in nature and will have no significant environmental impacts if completed under the protective features included in the Stream Alteration Agreement No. 2009-0158-R4.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.