Lake Forest Water Company Acquisition and Water System Reconstruction

5 Documents in Project

Summary

SCH Number
2010012067
Lead Agency
Tahoe City Public Utility District
Document Title
Lake Forest Water Company Acquisition and Water System Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2010
Document Description
The project includes the acquisition of the assets of the Lake Forest Water Company by the TCPUD and reconstruction of the water system within the Lake Forest Water Improvement District service area to meet California Waterworks Standards and the California Fire Code. TCPUD would assume opertaion and maintenance responsibilities for the water system within the LFWID area. Approximately 2,500 lineal ft (LF) of 12 inch PVC water main and ~8,050 LF of 8 inch PVC water marina would be installed in roadways and shoulders to replace the existing water system in the area. Water meter boxes and service laterals would be installed to individual parcels and 26 fire hydrants would be installed with the project.

Contact Information

Name
Matt Homolka
Agency Name
Tahoe City Public Utility District
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Lake Forest Rd
Zip
96145
Total Acres
~1
Parcel #
multiple, Placer County right of way
State Highways
28
Schools
North Tahoe HS, Tahoe Lake ES
Waterways
Lake Tahoe, Lake Forest Creek, Polaris Creek, Burton Creek
Township
15,16N
Range
17E
Section
4,5,32
Base
Kngs Bch
Other Location Info
City/Nearest Community: Tahoe City

Notice of Determination

Approving Agency
Tahoe City Public Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print