Mill Creek Bridge (Bridge No. 08-0133) Scour Repair and Deck Rehabilitation

3 Documents in Project

Summary

SCH Number
2010012049
Lead Agency
California Department of Transportation, District 2
Document Title
Mill Creek Bridge (Bridge No. 08-0133) Scour Repair and Deck Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2012
Present Land Use
Highway and Agricultural
Document Description
NOTE: Review Per Lead Rock slope protection will be strategically placed around the abutments and pier of the Mill Creek Bridge to reduce the potential for scour. Temporary diversions of the live stream will be necessary to conduct work. Rehabilitation of the bridge deck will entail removal of existing bridge deck joint seals and the asphalt concrete deck surface. New deck joint seals will be installed and a polyester asphalt overlay will be placed. Pavement approaches at the bridge will be adjusted to the height of the new deck. Metal beam guardrail at the bridge approaches will be upgraded to current standards and new traffic striping will be applied to the deck surface.

Contact Information

Name
Christopher Quiney
Agency Name
California Department of Transportation, District 2
Contact Types
Lead/Public Agency

Location

Counties
Tehama
Cross Streets
SR 36 (Bridge No. 08-0133)
Zip
96061
Total Acres
5.1
State Highways
172
Waterways
Mill Creek
Township
29N
Range
4E
Section
23
Base
Mineral
Other Location Info
City/Nearest Community: Mill Creek

Notice of Determination

Approving Agency
California Department of Transportation (Caltrans)
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print