Frances Knoll Major Subdivision

2 Documents in Project

Summary

SCH Number
2010011091
Lead Agency
San Diego County
Document Title
Frances Knoll Major Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2010
Document Description
The project is a major residential subdivision of 3.90 gross acres into 5 residential lots and one private road easement lot. The project site is located near the intersection of Hillsdale Drive and Vakas Road , in the Valle De Oro Community Planning Group, within unincorporated San Diego County. The site is subject to General Plan Regional Category(1.1) Current Urban Development (CUDA), and Land Use Designation 3 (Residential). Zoning for the site is RR2, Residential. The site contains an existing single family residence and several accessory structures that would be removed prior to recordation. Access to all lots will be provided by a private road easement connecting to Hillsdale Road. The project would be served by Otay Municipal Water District for both sewer and water. No extension of sewer or water utilities will be required by the project. Earthwork will consist of cut and fill of 13,000 cubic yards of material.

Contact Information

Name
Marisa Smith
Agency Name
San Diego County
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Vakas Dr and Hillsdale Rd
Zip
92019
Total Acres
3.90 gross
Parcel #
517-120-24, 25
State Highways
Hwy 54
Schools
Cajon Valley Union
Waterways
Sweetwater Oak River
Township
16
Range
1E
Section
19
Base
SBB&M

Notice of Determination

Approving Agency
Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print