Richardson Water Treatment Plant & Groundwater Wells [Richardson Well No. 5 (R5) & Mountain View Well (MV6)]
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010011061
- Lead Agency
- City of Loma Linda
- Document Title
- Richardson Water Treatment Plant & Groundwater Wells [Richardson Well No. 5 (R5) & Mountain View Well (MV6)]
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/25/2010
- Document Description
- NOTE: Shortened Review The NOI/Initial Study evaluated the potential impacts of the project, which includes two new water production wells on two separate lots on Cooley Avenue in the City of Loma Linda. The two wells were recently installed on improved lots owned by the City of Loma Linds. Well R5 is located ~50 ft east of Richardson Street on the south side of Cooley Avenue, and Well MV6 is located ~600 ft east of Richardson Street on the south side of Cooley Avenue. The NOI/Initial Study also evaluated the potential impacts of the new Richardson Treatment Plant (RTP), which is designed to treat a groundwater flow rate of 4,800 gallons per minute (gpm). The RTP includes ion exchange (IX) treatment and Liquid Phase Granular Activated Carbon (LPGAC) treatment of gorundwater from Wells R5 and MV6 to effectively remediate perchlorate and TCE, respectively. The RTP site is located on the southeast corner of Cooley Avenue and Richardson Street on two lots that have been annexed into the City of Loma Linda and bordered by the City of San Bernardino. Well R5 is also on this site with the Water Treatment Plant.
- Contact Information
-
Deborah Woldruff
City of Loma Linda Community Development Department
Lead/Public Agency
25541 Barton Road
Loma Linda, CA 92354
Phone : (909) 799-2831
Location
- Coordinates
- 34°07'55.2"N 117°25'20.8"W
- Cities
- Loma Linda San Bernardino
- Counties
- San Bernardino
- Cross Streets
- Richardson St & Cooley Ave (Treatment Plant & Well R5; for Well MV6)
- Zip
- 92354
- Total Acres
- 0.66
- Parcel #
- 0281-172-01
- State Highways
- I-10, SR 330
- Railways
- SPRR, BNSF, Metrolink
- Airports
- SBIA
- Schools
- Victoria ES, Loma Linda Academy
- Waterways
- Santa Ana River, San Timoteo Creek
- Township
- 1S
- Range
- 4W
- Section
- 24
- Base
- 1078 ft
Notice of Determination
- Approving Agency
- City of Loma Linda
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Loma Linda 25541 Barton Road Loma Linda, CA 92354
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.