Mitigated Negative Declaration for the Box Springs Feeder Repair Phase 3

3 Documents in Project

Summary

SCH Number
2010011051
Lead Agency
Metropolitan Water District of Southern California
Document Title
Mitigated Negative Declaration for the Box Springs Feeder Repair Phase 3
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2010
Document Description
The proposed Project involves the repair of 12 distressed sections along the Box Springs Feeder pipeline at 5 sites. The repair would involve the installation of a 90 inch diameter welded steel liner inside the 96-inch diameter pre-stressed concrete cylinder pipe (PCCP) sections. Work at the 5 repair sites include grading, vegetation removal, excavation of a shored pit, cutting and removal of a top portion of a PCCP pipe section, installation of a steel liner, concrete encasement of the pipe, backfill of the pit, and landscape/hardscape restoration.

Contact Information

Name
Lilia I. Martinez
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
north of Alessandro Blvd, west of I-215, and south of Central Ave
Zip
92507
Total Acres
11.75
Parcel #
263-050-007, 12; 263-1609-1-1 & 1-5
State Highways
I-215, SR 60
Railways
BNSF
Schools
Taft, Edgemont, Kennedy
Waterways
Sycamore Canyon Creek
Township
3S
Range
4W
Section
9
Base
SBB&M

Notice of Determination

Approving Agency
Board of Directors of the Mertopolitan Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print