Stillwater Wastewater Treatment Plant Infrastructure Improvements Project, Phase 1A and B.
Summary
SCH Number
2009128128
Public Agency
City of Redding
Document Title
Stillwater Wastewater Treatment Plant Infrastructure Improvements Project, Phase 1A and B.
Document Type
NOE - Notice of Exemption
Received
Posted
12/17/2009
Document Description
This project involves construction and improvement of infratructure components including: two new fine screens, a conveyor, and washer/compactor; new mixed liquor and secondary effluent flow splitters; an expanded RAS pump station; two new traveling bridge filters; two new secondary clarifiers; conversion of ERB #1 to a lined digested solids storage basin; and lining ERB #1. All work will occur within the existing footpring of the facility.
Contact Information
Name
Jonathon Oldham
Agency Name
City of Redding
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redding
Counties
Shasta
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15303
Reasons for Exemption
Class exemption include new construction of small facilities or structures, and the conversion of existing small structures from one use to another. All work will be within the existing developed footprint of the treatment plant facility. No new land will be acquired. The Phase 1 A and B upgrades have independent utility and will improve the waste treatment plant. This project does not change the overall capacity of the treatment plant. There are no known environmental resources within the project boundaries that could be affected by this project. There is no reasonable possibility that this project will have a significant effect on the environment. This NOE supersedes the Previous one dated July 13, 2009.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.