Final Design of Two Colorado River Aqueduct Rehabilitation Projects- Mile 12 Monitoring Station Upgrades, Gene Pumping Plant Storage Building Replacement
Summary
SCH Number
2009128006
Public Agency
Metropolitan Water District of Southern California
Document Title
Final Design of Two Colorado River Aqueduct Rehabilitation Projects- Mile 12 Monitoring Station Upgrades, Gene Pumping Plant Storage Building Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
12/2/2009
Document Description
The Metropolitan Water District of Southern California (Metropolitan) proposes to authorize final design to upgrade the flow and chlorine monitoring station at Mile 12 of the Colorado River Aqueduct and to construct storage buildings at Gene Pumping Plant. Planned improvements at Mile 12 monitoring station include replacing the flow meters, relocate date and communications equipment, and constuct a reilable power source. Improvements at Gene Pumping Plant include minor grading for a concrete pad installation and constructing two prefabricated buildings.
Contact Information
Name
Mike Melanson
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Other Location Info
Parker Dam
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Sect.15301,15302,15303,15304
Reasons for Exemption
The proposed project consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographic features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. The proposed project consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The proposed project consists of constuction and location of limited number of new, small facilities or structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures from on use to another where only minor modifications are made in the exterior of the structure.