Dowd Road Bridge Over Markham Ravine - Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2016-0029-R2)

5 Documents in Project

Summary

SCH Number
2009122041
Lead Agency
Placer County
Document Title
Dowd Road Bridge Over Markham Ravine - Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2016-0029-R2)
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2019
Present Land Use
Existing bridge and road: Zoned Farm; Agriculture or timberland; Public Facility; Placer County General Plan
Document Description
CDFW has executed Lake and Streambed Alteration Agreement 1600-2016-0029-R2, pursuant to section 1602 of the Fish and Game code to the project Applicant, Placer County Department of Public Works. The project will replace the existing narrow bridge along Dowd Road at Markham Ravine, just south of Nicolaus Road. The project consists of replacing the existing reinforced concrete slab bridge with two-span cast in place post tensioned slab. The new bridge and roadway approaches will accommodate two-lanes of traffic. A detour route will be provided along adjacent local roads including Williams Lane, Canal Road, Moore Road, and Nelson Lane. The project includes the demolition of the existing bridge. The replacement bridge will consist of a 2-lane, 2-span cast in space, post tensioned slab measuring 125 feet long and 35 feet wide. The new bridge and roadway approaches will accommodate two 12-foot lanes and two 4-foot wide shoulders, and a standard Caltrans Type ST-10 bridge rail. *SEE NOD FOR FULL DETAILS

Contact Information

Name
Angela Calderaro
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Lincoln
Counties
Placer
Cross Streets
Nicolaus Rd and Williams Ln
Zip
95648
Waterways
Markham Ravine
Township
12N
Range
5E
Section
13/14
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No