Northwoods Blvd/ Zermatt Dr/Davos Dr Pipeline Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009122022
- Lead Agency
- Truckee Donner Public Utility District
- Document Title
- Northwoods Blvd/ Zermatt Dr/Davos Dr Pipeline Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/1/2010
- Document Description
- Upgrade existing pipelines along portions of Northwoods, Blvd, Zermatt Dr, & Davos Dr in Truckee, Ca. New pipelines replace existing 8" & 10" pipelines in poor condition with new 8", 12" & 16" diameter lines to meet current & future water demands and fire flow protection. Homes along the alignments will be provided service connections to pipelines & in-line meter boxes. Appx 12 new fire hydrants will replace existing fire hydrants. Total pipeline length is about 6,800 feet. Standard construction activities associated with installation of water distribution pipelines & appurtenances. Majority of excavation within existing road prisms w/ appx 400' in an easement from Davos Dr to Zermatt Dr.
- Contact Information
-
Neil Kaufman
Truckee Donner Public Utility District
Lead/Public Agency
P.O. Box 309
Truckee, CA 96160-0309
Phone : (530) 582-3950
Location
- Cities
- Truckee
- Counties
- Nevada
- Cross Streets
- Northwoods Blvd, Zrmatt Dr, Davos Dr
- Zip
- 96161
- State Highways
- I-80
- Waterways
- Truckee River
Notice of Determination
- Approving Agency
- Truckee Donner Public Utility District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Truckee Donner Public Utility District 11570 Donner Pass Rd Truckee, CA 96161
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.