Resort Improvement District Coastal Development and Special Permit

2 Documents in Project

Summary

SCH Number
2009122015
Lead Agency
Humboldt County
Document Title
Resort Improvement District Coastal Development and Special Permit
Document Type
NOD - Notice of Determination
Received
Posted
4/12/2010
Document Description
A Coastal Development Permit and Special Permit for the construction of an approximately 2,400 square foot storage building used to store maintenance equipment associated with the golf course (Lot LK). The structure will be approximately 16 feet tall and constructed of non-reflective metal siding and roofing. The structure will be located approximately 86 feet from a perennial stream and a native planting plan is proposed along the stream corridor that will enhance the buffer and provide additional habitat. The project utilizes Section 1444 (Errors, Oversights or Omissions) of the County General Plan. It has been determined that the mapping of the boundary between the Natural Resources (NR) and Public Facilities (PF) portions was done in error. A Special Permit is required for Design Review.

Contact Information

Name
Trevor Estlow
Agency Name
Humboldt County Community Development Services Planning Division
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Upper Pacific Drive and Sea View Road
Zip
95589
Total Acres
12.6
Parcel #
111-181-06
Airports
Shelter Cove
Waterways
Pacific Ocean & Unnamed stream
Township
5S
Range
1E
Section
9&16
Base
HB&M
Other Location Info
City/Nearest Community: Shelter Cove

Notice of Determination

Approving Agency
County of Humboldt
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print