Waste Water Treatment Plant Expansion Project

2 Documents in Project

Summary

SCH Number
2009121065
Lead Agency
Arvin, City of (City of Arvin)
Document Title
Waste Water Treatment Plant Expansion Project
Document Type
NOD - Notice of Determination
Received

Document Description
The objective of this project is to address the potential discharge of nitrogen into the underlying groundwater related to the current solids handling facilities. A dewater sludge storage and staging concrete pad with drain system of sufficient size to store one year of sludge accumulation at 2.5 MGD will be included. The expansion of the WWTP will include the following: a). Construction to filtrate pump station and piping. b). Reconstruct plant water delivery pump system. c). Addition of concrete sludge staging area and elimination of sludge drying beds. d). Installation of sludge dewatering press and construction of dewatering shade area. e). Conversation of existing administration building into operation control building. f). Installation of a pre-engineered building as new administration building.

Contact Information
Issac A. George
City of Arvin
141 Plumtree Drive
Arvin, CA 93203

661-854-6183

Location

Cities
Arvin
Counties
Kern
Cross Streets
Southwest of Varsity Road and Campus Drive
Zip
93203
Total Acres
5
Parcel #
Portion of APN 190-020-45
State Highways
223
Railways
Rail American/SJV
Schools
Arvin High
Waterways
Caliente Creek (7 Miles North East)
Township
31
Range
29E
Section
34
Base
MDB&M

Notice of Determination

Approving Agency
The City of Arvin
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
141 Plumtree Dr Arvin, CA 93203

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes