San Juan Capistrano Eastern Wells and Pipeline Project
2 Documents in Project
Summary
SCH Number
2009121056
Lead Agency
City of San Juan Capistrano
Document Title
San Juan Capistrano Eastern Wells and Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
This project site has a General Plan land use designation of San Juan Creek and the adjoining bank areas as "1.0-General Open Space", and C. Russell Cook Park is designated "1.3- Community Park". The zoning "GNS"/ (general open space); Park is "CP" Community Park.
Document Description
The proposed project would consist of the construction of two replacement groundwater production wells, along with a collection pipeline. The proposed South Cook Park Well and Well 5A are two of the seventeen wells identified in the diversion permit. The proposed collection pipeline would connect the two replacement wells, South Cook Park Well and Well 5A, plus a third existing well, Tirador Well, to form a groundwater collection system in the vicinity of San Juan Creek and south of Calle Arroyo. The collection system would supply water from the San Juan Groundwater Basin (basin) to the City of San Juan Capistrano's Groundwater Recovery Plant (GWRP, located at 32470 Paseo Adelanto) for treatment before being introduced into the public water supply system. The treatment consists of removing iron, manganese and total dissolved solids (TDS) from the groundwater. The current capacity of the GWRP is 5.1 mgd (5,712 afy) which is within the limits allocated by the diversion permit of 8,026 afy. The addition of the proposed South Cook Park Well and Well 5A along with the current operating wells will not exceed the allotted amount of water to be extracted under the diversion permit.
The GWRP is currently fed by six (6) wells in the basin: Dance Hall, Tirador, CVWD No. 1, CVWD No. 2, SJBA No. 2, and SJBA No. 4. Phase 1 of the GWRP required 8 wells to feed the GWRP. The South Cool Park Well and Well 5A will complete the well requirements under Phase 1 for the GWRP, and will allow for effective management of the basin water. The purpose of the two replacement Eastern Wells (South Cook Park Well and Well 5A) is to provide system reliability and ultimately improve the flexibility of portable water production from these existing group of wells.
Contact Information
Name
Joe Mankawich
Agency Name
City of San Juan Capistrano
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Juan Capistrano
Counties
Orange
Cross Streets
Calle Arroyo and Rancho Viejo Road
Zip
92675
State Highways
Hwy 5, 74
Railways
OCTA Metrolink RR
Waterways
San Juan Creek, Oso Creek, Trabuco Creek, Horno Creek
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Transportation, District 12 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 12 (DOT)
Development Types
Water Facilities (Type recycled water)
Local Actions
Site Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation, Vegetation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.