Hercules Intermodal Transit Center

6 Documents in Project

Summary

SCH Number
2009112087
Lead Agency
Hercules, City of (City of Hercules)
Document Title
Hercules Intermodal Transit Center
Document Type
FIN - Final Document
Received

Document Description
Note: Final 1 Hard Copy The City of Hercules, in cooperation with the Federal Transit Administration, has prepared a joint EIR/EIS for the construction of a proposed intermodal transit center project which includes a new passenger train station (on the existing Capitol Corridor line), a bus terminal, and parking facilities. Specific project improvements include: 1) realignment of a portion of the existing Union Pacific railroad tracks, construction of a rail platform and retaining walls, and the replacement of a railroad bridge crossing Refugio Creek; 2) construction of a train station building with grade separated pedestrian access; 3) extension of John Muir parkway, including the construction of Bayfront Boulevard over Refugio Creek, Transit Loop Drive, and a surface parking lot; 4) realignment and restoration of approximately 1,000 feet of Refugio Creek from San Pablo Bay to the existing restored upper segment and including the North Channel; 5) construction of segments of the East Bay Park Regional District's Bay Trail, a paved recreational trail, along the shoreline from Pinole trail to Victoria by the Bay; 6) a pedestrian walkway over the railroad tracks to provide a connection to the proposed Hercules Point open space; and 7) relocation of existing utility and gas lines and a storm drainage outfall to Refugio Creek.

Contact Information
Lisa Hammon
City of Hercules & Federal Transit Administration
111 Civic Drive
Hercules, CA 94547

(510) 799-8251

Location

Coordinates
38°1'18"N 122°17'0"W
Cities
Hercules
Counties
Contra Costa
Cross Streets
John Muir Parkway and San Pablo Avenue
Total Acres
46.76
State Highways
I-80, SR 4
Railways
UPRR
Schools
West Contra Costa USD
Waterways
San Pablo Bay, Refugio Creek

Notice of Completion

Development Type
Transportation:Other (Intermodal Transit Center)
Local Action
Other Action Redevelopment Other Action: Transit Center
Project Issues
Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Soil Erosion/Compaction/Grading Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Flood Plain/Flooding Economics/Jobs Drainage/Absorption Coastal Zone Biological Resources Archaeologic-Historic Air Quality
Download CSV New Search