Hercules Intermodal Transit Center

6 Documents in Project

Summary

SCH Number
2009112087
Lead Agency
City of Hercules
Document Title
Hercules Intermodal Transit Center
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
The City of Hercules, in cooperation with the Federal Transit Administration, has prepared a joint EIR/EIS for the construction of a proposed intermodal transit center project which includes a new passenger train station (on the existing Capitol Corridor line), a bus terminal, and parking facilities. Specific project improvements include: 1) realignment of a portion of the existing Union Pacific railroad tracks, construction of a rail platform and retaining walls, and the replacement of a railroad bridge crossing Refugio Creek; 2) construction of a train station building with grade separated pedestrian access; 3) extension of John Muir parkway, including the construction of Bayfront Boulevard over Refugio Creek, Transit Loop Drive, and a surface parking lot; 4) realignment and restoration of approximately 1,000 feet of Refugio Creek from San Pablo Bay to the existing restored upper segment and including the North Channel; 5) construction of segments of the East Bay Park Regional District's Bay Trail, a paved recreational trail, along the shoreline from Pinole trail to Victoria by the Bay; 6) a pedestrian walkway over the railroad tracks to provide a connection to the proposed Hercules Point open space; and 7) relocation of existing utility and gas lines and a storm drainage outfall to Refugio Creek.

Contact Information

Name
Lisa Hammon
Agency Name
City of Hercules
Contact Types
Lead/Public Agency

Location

Cities
Hercules
Counties
Contra Costa
Cross Streets
John Muir Parkway and San Pablo Avenue
Total Acres
46.76
State Highways
I-80, SR 4
Railways
UPRR
Schools
West COntra Costa USD
Waterways
San Pablo Bay, Refugio Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), California Department of Transportation, District 10 (DOT), California State Lands Commission (SLC), California Public Utilities Commission (CPUC)
State Reviewing Agency Comments
California Department of Transportation, District 10 (DOT), California State Lands Commission (SLC), California Public Utilities Commission (CPUC)
Development Types
Transportation:Other (Transit Center)
Local Actions
Transit Center
Project Issues
Aesthetics, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print