Organics-Rich Materials Preprocessing Pilot Project (Addendum)
14 Documents in Project
Summary
SCH Number
2009112073
Lead Agency
East Bay Municipal Utility District
(EBMUD)
Document Title
Organics-Rich Materials Preprocessing Pilot Project (Addendum)
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2013
Present Land Use
Zoning: Industrial General; General Plan Designation: General Industrial/Transportation
Document Description
The EIR was prepared and certified in 2011 to serve as a high-level planning tool to guide development of the existing 48-acer MWWTP site and the newly-acquired, adjacent 15.9-acer West End property over a 30-year time horizon. The LUMP EIR identified two renewable energy projects for implementation in the near future-biodiesel production and food waste preprocessing - to help EBMUD meet sustainability goals by increasing on-site power generation. Both projects involves contracting with private companies under a land-lease agreement to construct and operate a facility at the MWWTP. The food waste preprocessing project has been modified as a scaled-down pilot project intended to evaluate the performance of equipment and procedures to preprocess organics-rich materials to determine necessary operations for full-scale food waste preprocessing.
Contact Information
Name
Vince De Lange
Agency Name
Office of the Secretary East Bay Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Oakland
Counties
Alameda
Cross Streets
Wake Avenue/West Grand Avenue
Zip
94607
Total Acres
63.9
Parcel #
000-0305-003-03, 000-0305-003-16
State Highways
I-80, 580, 880, 24, 13
Railways
UPRR, BNSF
Airports
No
Waterways
SF Bay
Notice of Determination
Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.