EBMUD Main Wastewater Treatment Plant Land Use Master Plan

13 Documents in Project

Summary

SCH Number
2009112073
Lead Agency
East Bay Municipal Utility District
Document Title
EBMUD Main Wastewater Treatment Plant Land Use Master Plan
Document Type
NOD - Notice of Determination
Received

Document Description
EBMUD's MWWTP Land Use Master Plan (Plan) would guide development of the MWWTP and the newly-acquired, adjacent West End property over a 30-year time horizon. The Plan coordinates near-term projects with potential expansion plans to maintain an efficient layout and minimize building demolition and facility relocation. Plan layouts provide sites for plan elements that may be developed in the future, many of which would not be constructed until needed to meet specific future regulations. The EIR evaluates the range of potential LUMP elements. Two near-term renewable energy projects are evaluated at a project level: biodiesel production and food waste preprocessing. Both would help EBMUD increase on-site power generation and maintain reasonable rates, and both involve EBMUD contracting with private companies under a land-lease agreement to construct and operate a facility at the MWWTP.

Contact Information
Vince De Lange
East Bay Municipal Utility District
375 Eleventh Street, MS 702
Oakland, CA 94607-4240

510 287-1141
vdelange@ebmud.com

Location

Coordinates
37°49'32"N 122°17'53"W
Cities
Oakland
Counties
Alameda
Cross Streets
Wake Avenue/West Grand Avenue
Zip
94607
Total Acres
63.9
Parcel #
000-0305-003-03, 000-0305-003-16
State Highways
I-80, 580, 880, 24, 13
Railways
UPRR, BNSF
Airports
No
Waterways
SF Bay

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search