Restoration of Robert W. Crown Memorial State Beach/Alameda Beach

2 Documents in Project

Summary

SCH Number
2009112072
Lead Agency
East Bay Regional Parks District
Document Title
Restoration of Robert W. Crown Memorial State Beach/Alameda Beach
Document Type
NOD - Notice of Determination
Received

Document Description
The Robert W. Crown Memorial State Beach/Alameda Beach Restoration Project proposes to: 1) restore the existing beach by depositing 82,600 cubic yards of dredged sand in two phases and then grading the sand to conform to it originally engineered 1988 footprint; and 2) extend the existing Park Street groin structure that separates the beach from Elsie Roemer Marsh bird sanctuary landward by approximately 100 feet. The groin structure extension would be concrete sheet pile construction (similar to the existing groin) or a rock rip-rap structure. The project would restore Crown Beach to its original, engineered configuration to provide shoreline erosion control, renew the swim beach experience and help keep sand out of the adjacent bird sanctuary.

Contact Information
Raphael Breines
East Bay Regional Parks District
2950 Peralta Oaks Court P.O. Box 5381
Oakland, CA 94605

510-544-2325

Location

Coordinates
37°45'28.55"N 122°15'40.46"W
Cities
Alameda
Counties
Alameda
Cross Streets
Otis Dr/Shoreline Dr/Park St
Total Acres
~200
Parcel #
074-1300-014-001, -013-002; 074-1025....
State Highways
I-880
Airports
Oakland
Schools
Wood MS, Alameda & St. Joseph HS
Waterways
SF Bay, San Leandro Channel
Township
2S
Range
4W
Section
13

Notice of Determination

Approving Agency
East Bay Regional Park District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
East Bay Regional Park District 2950 Peralta Oaks Court Oakland, CA 94605

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes