Restoration of Robert W. Crown Memorial State Beach/Alameda Beach

2 Documents in Project

Summary

SCH Number
2009112072
Lead Agency
East Bay Regional Parks District
Document Title
Restoration of Robert W. Crown Memorial State Beach/Alameda Beach
Document Type
NOD - Notice of Determination
Received
Posted
2/8/2010
Document Description
The Robert W. Crown Memorial State Beach/Alameda Beach Restoration Project proposes to: 1) restore the existing beach by depositing 82,600 cubic yards of dredged sand in two phases and then grading the sand to conform to it originally engineered 1988 footprint; and 2) extend the existing Park Street groin structure that separates the beach from Elsie Roemer Marsh bird sanctuary landward by approximately 100 feet. The groin structure extension would be concrete sheet pile construction (similar to the existing groin) or a rock rip-rap structure. The project would restore Crown Beach to its original, engineered configuration to provide shoreline erosion control, renew the swim beach experience and help keep sand out of the adjacent bird sanctuary.

Contact Information

Name
Raphael Breines
Agency Name
East Bay Regional Parks District
Contact Types
Lead/Public Agency

Location

Cities
Alameda
Counties
Alameda
Cross Streets
Otis Dr/Shoreline Dr/Park St
Total Acres
~200
Parcel #
074-1300-014-001, -013-002; 074-1025....
State Highways
I-880
Airports
Oakland
Schools
Wood MS, Alameda & St. Joseph HS
Waterways
SF Bay, San Leandro Channel
Township
2S
Range
4W
Section
13

Notice of Determination

Approving Agency
East Bay Regional Park District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print