UC Davis Sacramento Renovation for BGI at the Joint Genomics Center

9 Documents in Project

Summary

SCH Number
2009112060
Lead Agency
Regents of the University of California
Document Title
UC Davis Sacramento Renovation for BGI at the Joint Genomics Center
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2012
Present Land Use
Existing designations are for medical campus development.
Document Description
UC Davis proposes to remodel 9.531 gross square foot (gsf) of existing shell space within the Institute for the Regenerative Cures building on the UC Davis Sacramento campus to create the RGT at UC Davis Joint Genomics Center. The physical improvements to the building include finishing of existing shelled space to provide the necessary laboratory and support space for the proposed research efforts, in addition to laboratory space, the project will provide administrative support space, laboratory support space for materials handling, computer support space, and finishing for internal circulate spaces (laboratory corridors and public corridors).

Contact Information

Name
Sid England
Agency Name
Enviormental Stewardship and Sustainability
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Stockton Boulevard and Broadway Street
Zip
95817
Total Acres
1
State Highways
Hwy 50 and 99
Railways
UPRR
Airports
Sacramento Executive
Schools
Marion Anderson
Waterways
American River
Township
8N
Range
5E
Section
17
Base
MDB&M

Notice of Determination

Approving Agency
The University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print