UC Davis Sacramento Campus Long Range Development Plan

5 Documents in Project

Summary

SCH Number
2009112060
Lead Agency
University of California, Regents of the (Regents of the University of California)
Document Title
UC Davis Sacramento Campus Long Range Development Plan
Document Type
NOD - Notice of Determination
Received

Document Description
The 2010 Long Range Development Plan (LRPD) is the comprehensive land use plan that will guide physical development on the UC Davis Sacramento Campus through a projected horizon year of 2025. The plan describes anticipated growth in building space from approximately 3.4 million gross square feet to 6.6 million gross sq ft, and campus land use designations. Implementation of the 2010 LRPD is expected to increase the average daily population of the UC Davis Sacramento campus from approximately 12,500 to 19,700 staff, faculty, other academic personnel, students and interns, residents, fellows and visitors (including patients).

Contact Information
Charlotte Strem
University of California Physical & Environmental Planning
1111 Franklin St, 6th Floor
Oakland, CA 94607-5200

916-734-3811

Location

Coordinates
38°22'40"N 121°27'.64"W
Cities
Sacramento
Counties
Sacramento
Cross Streets
Stockton Boulevard and Broadway Street
Zip
95817
Total Acres
1
State Highways
Hwy 50 and 99
Railways
UPRR
Airports
Sacramento Executive
Schools
Marion Anderson
Waterways
American River
Township
8N
Range
5E
Section
17
Base
MDB&M

Notice of Determination

Approving Agency
The Regents of the University of California
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
UC Davis Health System Facilities Design & Construction 2315 Stockton Blvd Sacramento, CA 95817

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search