State Route 99 Manteca Widening Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009112045
- Lead Agency
- California Department of Transportation, District 6
- Document Title
- State Route 99 Manteca Widening Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/30/2011
- Document Description
- To widen the existing bridge crossing over Lone Tree Creek by 35 foot 4 inch within the median to provide an additional 12 foot lane and 10 foot shoulder in each direction of travel, separated by a concrete barrier. The bridge will also be widened by 30 foot on the east side to accommodate the northbound on-ramp at the French Camp Road interchange.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
Lead/Public Agency
3310 El Camino Avenue, Room 151
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Cities
- Manteca
- Counties
- San Joaquin
- Cross Streets
- Between Austin Rd interchange in Manteca and Arch Road interchange in Stockton
- State Highways
- 99
- Railways
- UPRR
- Airports
- Stockton Metropolitan
- Schools
- Golden West ES
- Waterways
- Lone Tree Creek, French Camp SLough, Littlejohns Creek
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Avenue Room 151 Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.