Pacific Gas & Electric Company Power Pole Relocation Project

9 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Pacific Gas & Electric Company Power Pole Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/19/2018
Present Land Use
Various, including flood damage reduction facilities, agriculture, residential, and public right-of-way.

Document Description
Approval of Permit No. 19189, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8: to install a new power pole on the left bank of Natomas Cross Canal for the relocation of an existing PG&E overhead power line; to remove three existing power poles in the left bank levee and backfill the resulting holes with controlled low strength material.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Avenue Suite 170
Sacramento, CA 95821

Phone : (916) 574-0651

Location

Coordinates
38°41'"N 121°36'"W
Cities
Sacramento
Counties
Sacramento
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento Int'l
Waterways
Sacramento & American Rivers, NCC, NEMDC, PGCC

Notice of Determination

Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
3310 El Camino Ave., Suite 170, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print