Natomas Basin Project/Natomas Levee Improvement Program Phase 4b Landside Improvements Project
15 Documents in Project
Summary
SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Basin Project/Natomas Levee Improvement Program Phase 4b Landside Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2018
Present Land Use
Various, including flood damage reduction facilities, agriculture, residential, and public right-of-way.
Document Description
This NOD is for Addendum 1 to the EIR for Phase 4b of the Natomas Levee Improvement Program (NLIP). The addendum analyzes modifications to removal of the Bennett and Northern Main Pumping Plants, improvements at Pumping Plant No. 4, relocation of the Vestal Drain, associated adjustments to access and staging areas, and associated use of increased amounts of fill material. The addendum concludes that these project modifications would not involve new or substantially more severe significant environmental effects or effects that were not analyzed in the Phase 4b EIR.
Contact Information
Name
John Bassett
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento Int'l
Waterways
Sacramento & American Rivers, NCC, NEMDC, PGCC
Notice of Determination
Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.