Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project

8 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2016
Present Land Use
Various, including flood damage reduction facilities, agriculture, residential, and public right-of-way.

Document Description
The overall purpose of the Natomas Levee Improvement Program is to bring the entire 42-mile Natomas Basin perimeter levee system into compliance with applicable Federal and state standards for levees protecting urban areas. The Phase 4b - Project - a component of the NLIP - consists of improvements to the remaining portion so the Natomas Basin's perimeter levee system and associated landscape, and irrigation/drainage infrastructure modifications.

Contact Information
Erin Brehmer
Central Valley Flood Protection Board
3310 El Camino Avenue Room 151
Sacramento, CA 95821

Phone : (916) 574-1900

Location

Coordinates
38°41'"N 121°36'"W
Cities
Sacramento
Counties
Sacramento
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento Int'l
Waterways
Sacramento & American Rivers, NCC, NEMDC, PGCC

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
3310 El Camino Ave., Room 151, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print