Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project

8 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2015
Present Land Use
Various, including flood damage reduction facilities, agriculture, residential, and public right-of-way.

Document Description
To place approximately 60,000 cubic yards of fill material along the landslide levee toe; replace a paved access ramp; remove an existing concrete lined irrigation canal at the landslide toe of the levee; remove three paved access ramps; remove trees and brush within the project limits; and revegetate the disturbed proejct area with native grass following fill placement.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Avenue Room 151
Sacramento, CA 95821

Phone : (916) 574-0651

Location

Coordinates
38°41'"N 121°36'"W
Cities
Sacramento
Counties
Sacramento Sutter
Cross Streets
Various
State Highways
Hwy 5, 99, 80
Airports
Sacramento Int'l
Waterways
Sacramento & American Rivers, NCC, NEMDC, PGCC

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
3310 El Camino Avenue Room 151, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes