Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project
9 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009112025
- Lead Agency
- Sacramento Area Flood Control Agency
- Document Title
- Natomas Post-Authorization Change Report/Natomas Levee Improvement Program, Phase 4b Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/15/2010
- Present Land Use
- Various, including flood damage reduction facilities, agriculture, residential, and public right-of-way.
- Document Description
- The overall purpose of the Natomas Levee Improvement Program (NLIP) is to bring the entire 42-mile Natomas Basin perimeter levee system into compliance with applicable Federal and state standards for levees protecting urban areas. The Phase 4b - Project - a component of the NLIP - consists of improvements to the remaining portions of the Natomas Basin's perimeter levee system and associated landscape, and irrigation/drainage infrastructure modifications.
- Contact Information
-
John Bassett
Sacramento Area Flood Control Agency
1007 7th Street, 7th Floor
Sacramento, CA 95814
Phone : (916) 874-7606
Location
- Coordinates
- 38°41'"N 121°36'"W
- Cities
- Sacramento
- Counties
- Sacramento Sutter
- Cross Streets
- Various
- State Highways
- Hwy 5, 99, 80
- Airports
- Sacramento Int'l
- Waterways
- Sacramento & American Rivers, NCC, NEMDC, PGCC
Notice of Determination
- Approving Agency
- Sacramento Area Flood Control Agency
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- http://www.safca.org/Programs_Natomas.html
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.