Permit No. 19732 – ARCF Project / Natomas PACR / NLIP, Phase 4b Landside Improvements Project, Phase 4b Landside Improvements Project, SMUD Utility Relocation
15 Documents in Project
Summary
SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 19732 – ARCF Project / Natomas PACR / NLIP, Phase 4b Landside Improvements Project, Phase 4b Landside Improvements Project, SMUD Utility Relocation
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2023
Document Description
Approval of Permit No. 19732, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To authorize installation of twenty four (24) new power poles (10 steel & 14 wood poles) along the landside portion of the Garden Hwy, remove forty one (41) existing wooden poles from the landside and waterside portion of the Garden Highway levee, replace-in-place two (2) existing poles (1 steel & 1 wood poles) from the landside portion of the Garden Highway, and three (3) poles (2 wood and 1 steel pole) are to remain on the landside portion of the Garden Highway. The new utility pole line will be installed and then the existing poles will be topped, and the electrical overhead lines will be removed. The bottom portion of the existing pole along with the communication utilities will remain until they are relocated. This utility relocation project is required for the Natomas Basin Civil Works Project.
Contact Information
Name
Jennifer Calles
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist, Specialist
Contact Types
Responsible Agency
Phone
Location
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located along the Garden Highway beginning from the intersection of Garden Highway and Gateway Oaks drive and ending approximately 375 feet west from the intersection of Garden Highway and Arden Garden Connector, in Sacramento County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.