Permit No. 19603: NLIP Phase 4b Project – Utility Relocation

15 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 19603: NLIP Phase 4b Project – Utility Relocation
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2022
Document Description
Approval of Permit No. 19603, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To authorize relocation of two (2) existing AT&T poles and cables, and install one (1) new temporary pole within the flood control right of way along the Sacramento River East Levee. Relocated poles will be on the immediate north side of San Juan Road, east of Garden Highway. The new temporary pole will be along the same alignment with the relocated poles, but on the west side of Garden Highway. This project is needed for the Natomas Basin Project.

Contact Information

Name
Jamie Silva
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located where San Juan Road crosses Garden Highway, at 38.62736°N 121.56017°W, Reclamation District 1000, Sacramento River East Levee, in Sacramento County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print