Eastwood Farms Mutual Water Company Consolidation with East Valley Water District

3 Documents in Project

Summary

SCH Number
2009111072
Lead Agency
East Valley Water District
Document Title
Eastwood Farms Mutual Water Company Consolidation with East Valley Water District
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2011
Present Land Use
GP: None with Public Roads
Document Description
Eastwood Farms Mutual Water Company (MWC) plans to consolidate their 80 service connections into the East Valley Water District (EVWD). EVWD currently serves ~68,000 people through 21,827 service connections in San Bernardino County. Two water supply wells currently serving Eastwood Farms MWC have collapsed and has no sources other than an emergency intertie with EVWD. The planned consolidated and distribution system upgrade consists of installing 3,372 feet of 12" ductile iron pipe, 2,145 feet of 8" ductile iron pipe, 22 fire hydrants, and other related appurtenances. The project should eliminate Eastwood Farms MWC's source capacity problem and bring their distribution system up to current standards.

Contact Information

Name
Kelvin Yamada
Agency Name
CA Dept. of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Highland
Counties
San Bernardino
Cross Streets
3rd St, 5th St, 6th St, and Tippecanoe Ave
Zip
92346
State Highways
No
Railways
No
Airports
San Bernardino Int'l
Schools
Yes
Waterways
Santa Ana River
Township
1S
Range
4W
Section
Unsect
Base
SBB&M

Notice of Determination

Approving Agency
CA Dept. of Public Health
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print