3100 5545 (TM) Pauma Estates Tentative Map Major Residential Subdivision

2 Documents in Project

Summary

SCH Number
2009111048
Lead Agency
San Diego County
Document Title
3100 5545 (TM) Pauma Estates Tentative Map Major Residential Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2010
Document Description
The Pauma Estates project is a residential subdivision that would subdivide a 22.5-acre parcel into 16 residential lots and one 7.5-acre open space lot in the Pala-Pauma Community Plant area. The site is subject to the Regional Land Use Element Policy 1.5 Country Towns (CT) and the majority of the site (approximately 15 acres) contains a land use designation of (5) Residential 4.3 du/acre with RS-4 (Single Family Residential) zoning specifying a minimum lot size of 10,000sf. The remaining seven acres are designated as (24) impact Sensitive with A-70 (Limited Agricultural) zoning specifying a minimum lot size of 4-acres. The project would retain one existing single family residence located on small hill in the southeast corner of the project site. Access would be provided by Temet Drive, which would be improved to meet the County's public road standards. The Pauma Valley Community Services District (CSD) would provide public sewer to the project and portable water would be provided by the Rancho Pauma Mutual Water Company.

Contact Information

Name
Larry Hofreiter
Agency Name
San Diego County
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Pauma Valley Dr / Temet Dr
Zip
92061
Total Acres
22.63
Parcel #
1301002700 Section: Pauma Land Grant
State Highways
SR 76
Airports
Pauma Valley Airpark
Waterways
San Luis Rey River
Other Location Info
City/Neares Community: Pala Pauma

Notice of Determination

Approving Agency
County of San Diego Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print