Boeing Torrance Southern Parcel Corrective Measures Study

2 Documents in Project

Summary

SCH Number
2009111018
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Boeing Torrance Southern Parcel Corrective Measures Study
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2010
Document Description
DTSC selected remedies recommended in a Corrective Measures Study (CMS) Report titled The Property Parceling Document prepared by The Boeing Company for the southern portion of the former Boeing facility. Selection of the remedies will allow Boeing to implement the corrective measures selected and obtain a Corrective Action Complete with Controls determination form DTSC for the southern portion of the property. After the remedies are implemented, corrective action will be terminated in the southern portion of the site, and the existing Corrective Action Consent Agreement between DTSC and Boeing would be revised to include only the northern portion of the property.

Contact Information

Name
Wayne Lorentzen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles
Cross Streets
West Lomita Blvd and Telo Ave
Zip
90505
Total Acres
9
Parcel #
7377-005-078, 079
State Highways
Hwy 1
Railways
UPRR
Airports
Torrance
Schools
27
Waterways
0
Township
4S
Range
14W
Section
34
Base
Torrance

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print