(SAA #1600-2006-0435-R5) Vesting Tentative Tract Map No. 52047, CUP No. 96-101, and OTP No. 96-101 (Bridlevast)

Summary

SCH Number
2009109011
Lead Agency
Los Angeles County
Document Title
(SAA #1600-2006-0435-R5) Vesting Tentative Tract Map No. 52047, CUP No. 96-101, and OTP No. 96-101 (Bridlevast)
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2009
Document Description
The applicant proposes to alter the streams in order to develop 39 single family residential lots on the 51.8 acre project site. A total of 2.92 acres of Department jurisdictional streams are present on the site, all of which will be impacted by the proposed project. Mitigation will include 5.64 acres of california walnut woodland/southern sycamore riparian woodland dominated by southern California black walnut (Juglans californica californica), western sycamore (Platanus racemosa), and coast live oak (Quercus agrifolia) (3:1 for the permanent impacts); 2.08 acres of southern willow scrub dominated by black willow (Salix goodingil), arroyo willow (Salix lasiolepus), sandar willow (Salix exigua), mule fat (Baccharis salicifolia), and freshwater marsh dominated by cattails (Typha sp.) (2:1 for the permanent impacts). The project is located on the south side of the San Bernardino Freeway, ~450 ft east of Palomino Drive, in the Covina Highlands zoned district, in Los Angeles County.

Contact Information

Name
Rick Mayfield
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print