El Dorado Forebay Piezometer Installation

Summary

SCH Number
2009108261
Public Agency
El Dorado Irrigation District
Document Title
El Dorado Forebay Piezometer Installation
Document Type
NOE - Notice of Exemption
Received
Posted
10/28/2009
Document Description
The Federal energy Regulatory Commission requires that EID install additional piezometers in El Dorado Forebay Dam along the maximum section. The purpose of this action is to better assess the effects of the foundation drain on the piezometric levels in the lower portion of the embankment fill and to verify the downward gradients apparent at existing piezometers. To facilitate installation of the piezometers, a drill rig will drill 5 vertical holes through the embankment dam in order to install the piezometers. The work is expected to be completed beginning October 26, 2009.

Contact Information

Name
W. Chris Word
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Other Location Info
Pollack Pines

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1m
Reasons for Exemption
Minor repairs and alterations to existing dams and appurtenant structures under the supervision of the Department of Water Resources.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print